亚洲和欧洲一码二码区别在,人妻丰满熟AV无码区HD,国产在线98福利播放视频,男人边吻奶边挵进去视频

Service hotline:

0315-5913666

+86-18931500255

Domestic > Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project
呂家坨(選用).jpg
  • 呂家坨(選用).jpg

Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project

Type: Coking coal preparation plant

Scale: 3.6Mt/a

Contracting mode: partial contracting and renovation projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, while the fine coal slurry is sorted by a flotation machine. The existing system is used for flotation, pressure filtration, and concentration, and the washing water is closed loop, which is environmentally friendly and energy-saving.